Cross the A283 and live! [update 2]

Bridleway crosses A283
The Shoreham Herald reports that WSCC Rights of Way Committee has now agreed to the new bridleway that will allow users of the Downs Link to avoid having to cross the A283:

It will run close to the River Adur, passing under the A283 road bridge, through a field, across a ditch and through a wooded highway verge to rejoin the Downs Link at its existing crossing point. It adds 970m to the length of the route.

Measure twice, cut once


Steyning Grammar will be celebrating 400 years of existence in May with a variety of events including:

  • 24th May: the opening of the Church Street School and grounds to the public with archive material relating to the school’s history on display;
  • 24th-25th May: three performances each day of ‘Carvings, Corridors and Timbres’, a musical about the school, at the Church Street site;
  • 26th–28th May: a heritage quilt will be on display in the Church of St Andrew and St Cuthman;
  • 29th May: Janet Pennington will give a talk on ‘Steyning Grammar School, 400 Years of Education’ at 2:00pm in Bolton House;
  • 7th March–31st August 2014: an exhibition titled ‘The Scholar’s Tale — 400 Years of Schooling in Steyning’ at Steyning Museum.

Further details about these and other events can be found here.

The wrong kind of snow

A27 flooded in 2012
The Worthing Herald reports:

Despite £800,000 being spent fixing the drainage on the A27, the busy trunk-road is still vulnerable to flooding with fed-up motorists facing yet more delays last week.

After months of disruption and lane closures in 2012, the dual carriageway still could not cope with the volume of water coming off the South Downs this winter.

But the Highways Agency denies that its drainage work has failed, arguing that it was never meant to deal with this kind of flooding.