2012 10 11 PC Minutes

Minutes of Ordinary Parish Council Meeting at 7.30pm on 11 October 2012 held at the Village Hall

Present: Chairman Ms K. Watson, Vice Chairman Mr M Trist Councillors Ms L. Dyos, Mrs P. Rowland and Clerk to the Council Mrs Andrea Dickson. Chairman of Mid Sussex Council Mandy Thomas-Atkins, MSDC Councillor Colin Trumble, West Sussex District Councillor Peter Griffiths and 12 members of the public

1. Chairman welcomed the members of the public and introduced Chairman of Mid Sussex Council — Councillor Mandy Thomas-Atkins

2. Apologies: None

3. Declaration of Interest: None

4. The minutes of the previous meeting held 12 July 2012 having been previously circulated, were taken as read and approved and signed by the Chairman.

5. Matters Arising.
Planning: Old Pump House — In July 2012 enforcement order that was lodged in October 2011 was upheld by the planning inspector. A period of 9 months has been given to cease residential use and one extra month to remove the caravan and tidy up the land.

Market Garden — The PC met with Nick Rogers (Development Manager) and Steven King (Team Leader) planning investigation and enforcement, both Mid Sussex planning, at the end of August. Market Garden and other general planning queries were discussed. Progress with Mid Sussex planning will be monitored. The PC will be writing to MP Nick Herbert to ask for his help in addressing various issues relating to travellers. The PC was disappointed to hear that some residents did not feel that it had pulled its weight over the Market Garden issue. The councillors felt it needed to go on record that a large amount of work goes on behind the scenes and that they felt very frustrated over the issue. The public could comment on this matter at the end of the evening when comments are invited from the floor.

Preston Nomads — Only 4 (possibly 2) of the initial 6 people are still interested in the parking spaces. Residents who wish to take up the parking spaces need to collect padlock keys, those who do not intend taking up the spaces need to return the post keys. If anybody knows of anybody else that may be interested in a space please contact the Clerk. The car park area will be planted this month with indigenous plants. The possibility of filling in the potholes in the bridleway immediately outside the entrance is being looked into by Preston Nomads. The PC wish to thank Paul Hird for his work on this matter. (Clerk) A reminder that planning applications which fall within the SDNP are now posted on the South Downs website rather than Mid Sussex.

Highways: A meeting was held with highways on the 25 September to discuss ongoing problems.

Shepherd & Dog — A temporary cure is in place; however with autumn approaching it is felt that more work needs to be carried out. WSCC have investigated and will submit a request for further works, after which the PC will look at turfing the banks to complete the works. Stones have been washed down from the bridleway onto the highway by The Shepherd & Dog. Highways are going to discuss this with the bridleway owner and public rights of way.

Lady Brook Spring — A works order has been raised by WSCC to fence the spring. As a temporary solution the bollards will be replaced with a fibreglass plate over the entrance. A notice will be placed in Pigeon Post to gauge interest in making a feature of the spring. (Clerk)

Four Acres Corner — The drain & pipe have been flushed through. The size of the sump should have been increased at the same time — this was not done. Tim Boxall WSCC will chase this up. Once this work has completed the PC will monitor the situation.

Clappers Lane banking — The condition of the banking is the responsibility of the adjoining landowners. Highways have written to them but received no response. Highways suggested that the PC write to the Landowner & the person responsible for the damage Grange Farm and Badgerswood respectively. (Clerk).

Clappers Lane road surface — Highways will write to the landowner opposite The Sands to request that the ditches be cleared/kept clear. Highways were on site earlier today with Drainage Strategy team to look at the north end of the road. Contrary to what the PC had previously been told, it appears that no works order had been placed for the road surface to be repaired prior to that meeting. Highways suggested that all landowners be reminded to cut back hedges as winter approaches- this should be a request in Pigeon Post. A suggestion was made at the Village Plan meeting that signs could be placed at the north end of Clappers Lane saying something like “do not follow SatNav – unsuitable for large vehicles” Highways and PC will look for suitable signage for each end of the village.

Footpath 4f — This is still with the legal department; the order is expected to be made in the near future. The PC will be advised and then there will be a 28 day statutory objection period.

Stiles & Gates — The repair and maintenance of stiles and gate on public rights of way are the responsibility of the landowner over which the route crosses. This is also the case for trees, hedges, side vegetation and fences. The only exception are bridges which are the responsibility of Highways.

Ram Pump House — The National Trust have completed the work on the door and lock. Kate Watson and the National Trust are the key holders.

North Town Field — This will be addressed as a separate agenda item.

Councillor Vacancy — There is still a vacancy so please ask around.

PC Official documentation — The Standing orders, Financial Regulations, Code of Conduct and Declaration of Interest are all available via the Website, or as a hard copy from the Clerk.

Training Courses — The Clerk is half way through the first module of the Working with your Council Course. The clerk is also attending a networking day in November.

Joint Parish Meeting — This was held at Albourne in September. Councillors were present from Albourne, Poynings, Twineham and Woodmancote. Disappointingly nobody from MSDC planning attended the meeting, even though they were invited as a large part of the meeting revolved around planning. Councillor Sue Seward has asked to be copied in on any planning issues, and she will try and arrange a meeting with the planning dept to discuss concerns. All councils will review in six months and decide the way forward. Faster Broadband was discussed at the meeting; Fulking had a good response with 66 households expressing an interest in faster broadband. Please encourage anybody who has not already signed up to the scheme to do so. Suppliers are being invited to tender by the summer of 2013 with the faster broadband being in place by 2015.

Website — The new website is up and running and very easy to use. The new website address is fulking.net.

WSCC Councillor Peter Griffiths gave a brief report. He apologised for his absence from recent meeting; this is due to a clash of duties. In the future the two main costs to West Sussex will be care of the elderly and the cost of waste disposal. Providing these services will mean that other services will need to be reduced. It was suggested that an article be placed in the Pigeon Post with regards to the mobile library service. (Clerk)

6. Councillor Colin Trumble MSDC gave a brief report: Council Tax changes to benefits consultation will be completed by December. Auditing of single occupancy claims will be carried out to ensure it is fair. E-bills will be available to those who wish to pay that way, it is envisaged that this will save a lot of money. Grants to community groups that do not need matched funding. Money may still be available, but would have to be spent within the current financial year. Colin to provide more information on this. Budget Work has started on this for 2013/2014. Travellers were mentioned briefly and Councillor Linda Dyos said that he would be hearing from the PC shortly on the matter. Councillor Colin Trumble left the meeting 7.45pm for other commitments.

7. Financial Matters. The following payments were agreed and cheques signed: 100582 SALC Clerk’s networking day 60.00; 100583 Clerk’s salary & expenses 934.77; 100584 Councillor expenses 11.20. Cheque stubs were cross checked with the cheque list and both signed. The quarterly bank reconciliation was checked and signed. It was agreed that the Financial Regulations would be changed to state Internal audits would be carried out Annually rather than regularly as previously stated. (Clerk) It was agreed that the PC would look into setting up E banking (Chair)

8. Winter Management: The winter management plan is well underway. A meeting will be held in the next few weeks with WSCC to discuss the plan. Once it has been finalised a copy will be posted on the website and on the parish notice board. (Clerk) Farmer David Ellin still has an agreement with WSCC for the loan and use of the snow plough .(Michael Trist will contact the farmer when it is necessary to use the snow plough ). The clerk attended the Mid Sussex Emergency Planning liaison Group meeting in September and had nothing to report back from the meeting. It was felt that as Fulking is a small parish, the meeting would not have much relevance and therefore apologies would be sent for future meetings.

9. Risk Assessments: The Financial risk assessment and risk assessment having previously circulated were agreed and adopted. They will be placed on the website or hard copies available via the clerk. (Clerk)

10. Playground inspection review: The annual Rospa inspection was carried out in June; this highlighted a low risk of entrapment in the gate. The PC asked if anybody had any ideas how this risk could be eliminated? Mark Stepney will carry out the remedial work on the trip hazard and the moss which were also highlighted in the annual inspection. The weekly inspection rota needs to be updated. (Clerk). New inners for the bins in the playground need to be purchased (Clerk)

11. Community Bus: Has provided a service to Fulking for 20 years two days per week. It is free to bus pass holders, otherwise journeys will cost between 1-2 depending on the length of the journey. The PC agreed to give a contribution of 100 for this financial year. This will be reviewed annually. An article will be put in Pigeon Post to give details of the service provided. (Clerk) A thank you letter is to be sent to the providers (Clerk).

12. Fountain: The PC will arrange for the bollard in front of the fountain opposite Laurel House, to be fixed. Paula Hazard has the bollard. (Pam Rowland to contact Mark Stepney).

13. Crime Update: Crime in Fulking was low over the summer. Please stay vigilant. A notice about cheap shed alarms from MSDC will be placed in the noticeboard, website & Pigeon Post. (Clerk)

14. Comments from the floor: Card making day on 13 October. The Police Authority Elections were mentioned. Where is the Polling Station? This is to be looked into & published on website and noticeboard.The Polling Station is Playing Field Pavilion, Poynings BN45 7BH (Clerk)

15. Dates of the next meeting: The next Parish Council meeting will be held on 10 January 2013

Meeting closed at 9.05pm

[ BoilerPlate plate = “PC_Disclaimer” ]

Village Plan – Original Ideas from 2010

Here are the original discussion notes from the Village Plan Working Party first published back in 2010. Things have moved on since then.

The Future Requirements of Fulking village?:-

Fulking is a unique and lovely rustic country village situated in an Area of Outstanding Natural Beauty (AONB), of which there are not many left in Sussex, and now set in part of the South Down’s National Park.

Mid Sussex District Council (MSDC) is urging all towns and villages to prepare a development plan for their own area looking ahead up to 2026. If we do not present a plan then MSDC will prepare one for us based on what they think we require, and all future Parish Councils will be required to work towards it. The Parish Council therefore feel it is important that the village produces its own plan for the future, rather than have one imposed by MSDC.

1) Enhance the conservation area of the Village
This can be achieved by removing all telephone poles and putting the cables underground (see also item 6) and perhaps in 2012 with the much stronger signal of Digital T.V. the aerials could be placed in the loft where practical.

2) Limiting the continual enlargement of Dwellings
Within the conservation area, enlargement to properties is often carried out by developers who then sell the property on within some two to five years. With enlarged homes comes the problem of increased numbers of family and then more cars parked in The Street and Clappers Lane . If an extension is allowed within the Conservation Area then it should be to the rear of the property and should not alter the appearance as seen from the road.

3) Embrace the new MSDC and National Park policy
NO new housing development in the National Park, except in very exceptional circumstances.
Clappers Lane should be made a quite lane by WSCC as it is now within the National Park and will be used by a lot more walkers, horse riders and cyclist.

4) The Sewerage Plant:
Must be brought up to the latest EU standards. This would prevent all the lush weed growth which then chokes up the stream, and also bring the discharged water quality up to the standard required to stop pollution of the River Adur and to some small degree, the sea in which we bathe.

5) Village Car Park
We need a Village car park to cater for visitors to the village, customers of the pub and walkers access to the Downs. The Car park must be a green parking area suitably screened to blend with the surrounding area.

6) Telephone and Broad Band System
Due to the increased potential to work at home and to allow any business to function efficiently, the telephone and broadband system must be greatly improved. We all know of the system’s slowness even though it is supposed to operate at 8Mb. Even with a direct line from the exchange to Manor Farm businesses, they are still experiencing many problems. This improvement should be possible if the villages of Poynings, Fulking, and Pyecombe all group together and push for early installation of the new 100Mb fibre optic system for which the government has given permission and which is to be installed all over England within two years (if you can believe this is possible!).

7) Village/Church Hall
A new hall will soon be required as the present one is falling apart due to woodworm and rot. Insulation against heat loss is non-existent as it was built 1902. The new government standards require disabled access and car parking so perhaps a new village hall could be built in the village car park. It should be built to modern standards and fitted with solar panels to reduce the hot water bills.

8) Affordable Housing
A very difficult subject. The main considerations are young people who have lived in the village all their life cannot afford to buy houses here, so they move away leaving their parents who often become unable to manage on their own. The parents are then forced to move away to nearby towns, their house is then sold and the chance to help their parents in old age, and another chance to live in the village is also lost.

9) The Chapel
When the old village hall is demolished, the Chapel, a feature of the village which is still in reasonable condition, should remain and there are several possibilities for its future if let out by the church; it could become a village tea room and small village shop; suitable small business such a firm of accountants, computer sales and repairs, a secretarial service; it could even be converted to living accommodation with an extension at the back. Such options would not alter or spoil the look of the conservation area, whereas to demolish the two buildings and build a new cottage/ house would spoil the rustic charm of the village and would look out of place.

10) Children’s Play Area
This part of the village has been a constant expense for all previous Parish Councils and it is costing the P.C. a lot of extra money. One major expense is the repeated topping up of the bark in the enclosure around the climbing frame. This needs to be replaced by a modern permanent safety material that does not require any maintenance.

11) Allotments
This is a recent issue started by the organic movement and the credit squeeze. There are only a few people who think they want an allotment as most are too busy today with family activities. TV, computers and other modern technology.
The solution that the P.C. therefore suggested is that if anyone has more garden than they need, the P.C would introduce them to a person wanting an allotment and let things takes their course.

These are The Parish Council’s thoughts for the future of the village and the start of the Village Plan.

The Parish Council would like to hear from anyone who has ideas they think should be included in this suggested plan, or indeed comments on items they do not agree with. Please reply to Paula Hazard The Parish Clerk, or to one of the Parish Councillors. Please have your say!! Your views can be expressed at the Parish Council meeting on Thursday 9 September 2010, 7.30pm at the Preston Nomads Cricket Club House. If indifference is shown, then it will be adopted as the official plan for Fulking and lodged with the MSDC.

2010 04 08 PC Minutes

Minutes of the Ordinary Meeting of Fulking Parish Council held in the Village Hall, Fulking on Thursday 8 April 2010 at 8.00pm

Present: Chairman Mrs Jenny Vaughan, Vice Chairman Mr Tony Brooks, Councillors Mr Richard Corner, Mrs Jennifer Parmar, Mrs Pamela Rowland and Clerk to the Council Mrs Paula Hazard.

Apologies for Absence: None

Declarations of Interest by Members (if any) are shown against the relevant items in the minutes.

Minutes — The minutes of the meeting held on 14 January 2010, as previously circulated, were approved, accepted and signed by the Chairman.

County Council Update — County Councillor Peter Griffiths gave an update to the meeting on Highways, Schools and the National Park. The issue of whether the Planning Authority will lie with the District Council or the National Parks Authority had not been resolved yet. In response to Councillor Brooks query about returning to the method of the County Council paying local farmers to clear the snow, he advised the PC to write to Derek Whittington who is Cabinet Member for Strategic Planning and Transport. The PC had already requested a return to this method to the recent WSCC snow summit by writing to WSCC and SALC. Clerk to write to Derek Whittington reiterating this view.

Highways: Flooding problem near The Sands the stream had been cleared out and water was flowing through the pipes.

There was no further information about the request for a non-skid surface at the northern entrance to Clappers Lane. County Councillor Peter Griffiths said that he was chasing up this issue.

Flooding problem by the Shepherd and Dog stream culvert: The owner of the Shepherd and Dog, Geoff Moseley, had had a meeting with WSCC Highways and it was understood that the outcome was that he was going to fit a larger overflow pipe. He expressed at the meeting that there was a problem with clearing the gulley and felt that not enough maintenance had been carried out by Highways in the past. It was agreed that the PC should send CC Peter Griffiths the correspondence between the PC and Highways about this issue so that he could look into the matter.

Tree problem at Stammers Hill: A tree surgeon who had carried out previous work in the North Town Field had identified a potentially dangerous sycamore tree. The local tree warden, Barry Leppard, also agreed there was a problem and had reported this to WSCC Highways. The Arboriculturalist Southern Area WSCC had inspected the tree in March and had concluded that it was not a health and safety risk. He also stated that the tree was not on Highways land. An independent tree surgeon was asked to quote for the required work as the PC would have to pay the bill. The quote was around 700 which was not an immediately manageable sum. As the WSCC Inspector had judged it not to be of any immediate danger, the PC had decided to monitor the situation and ask for another assessment by WSCC at the end of the summer. It was agreed that the PC should ask for the opinion of another tree surgeon as soon as possible.

North Town Field: Cost of Maintaining Play Area — It was noted that the costs of maintaining the Field play area were escalating and were becoming beyond the budget of the PC. The costs included maintenance of the play equipment, tree work around the playground and a replacement surface for the barkpit. A quote for wetpour rubber had been received of 8500. Geoff Moseley was able to recommend a company that could provide a better value rubber surface that would comply with Health and Safety Guidelines as he had experience in this area.

New Play Equipment — The PC had submitted an application for a grant from WSCC County Local Committee who would be meeting on 27 April. Fund raising was under way in the village. An appeal flyer had been sent to every household in the village. The PC had also approached local businesses and applied for a grant from West Sussex Community Chest (run by Hall and Woodhouse) with a decision due before July.

Play Area Surface — quotes were being obtained for replacing the barkpit as a surface. The PC has looked at an ecomulch and wetpour rubber surface. It would be necessary to apply for a further grant to cover these costs.

Mowing and Maintenance of field — The first mow of the year had been done. Some tree work had also been carried out.

Public Liability Insurance: No further update from the NTF Trust.

Fly-Tipping at the Bostal: There was no further update about the ownership of the entrance area.

Phone Box: The Clerk had written to BT and they had confirmed that they did not currently have any plans to remove the telephone service.

Diverted Footpath 4dF: There was no further news from the Rights of Way Committee.

Reopening of Bridleway 11F: There was no further news from West Sussex Rights of Way.

Local provision of grit: The PC discussed the problem of where to locate grit bins. The eastern bank of Clappers Lane near The Street junction had been looked at but it was agreed that it would mean the grit bin would be placed too high and be difficult to access. Other suggestions were by the bus stop. Precise locations for the bins remain to be decided.

Village Plan: There had been a good response to Councillor Brooks’s discussion document in the Pigeon Post. All the replies would be kept and used to formulate the Village Action Plan. A talk would be given at the APM by a representative from Action in Rural Sussex about the process. The next stage would be to form a committee of representatives from the village to produce the Village Action Plan.

Market Garden Site: The PC had not been able to write to MSDC Enforcement as no evidence had been forthcoming that there was another family living on the site.

Ram House: The PC had asked the National Trust to carry out the repairs to the roof of the Ram House. However they had responded that they did not own it and therefore did not bear any responsibility for it. It appeared that this was borne out by historical documents and that ownership did rest with the Parish Council. The previous PC had asked the National Trust to take over ownership of the Ram House but they had not responded. As it is a historical structure the PC agreed that ownership of the Ram House by the National Trust fell within their remit. It was agreed that the PC should write to the National Trust again asking that they take over ownership.

The fountain had been repaired in 1995 with the aid of grants from West Sussex County Council, Mid Sussex District Council and Sussex Rural Community Council. The Chairman asked CC Peter Griffiths if there was a possibility of grant aid for the Ram House.. He advised that the PC should put this request in writing explaining the problems caused by the damaged roof.

Financial Matters: The Chairman and Vice Chairman signed off the interim audit, cheque list and cheque stubs.

AOB: Councillor Brooks updated the meeting about the goal of improving broadband access with a fibre optic system. Whereas previously it was envisaged that this would cause huge disruption with road digging and replacing the telegraph poles, it appeared that there were now new methods of installing fibre optic cables involving the use of existing sewer networks which would greatly reduce disruption.

The meeting was opened up for local residents to raise any issues.

The issue of affordable housing was raised. It was discussed that Mid Sussex District Council had in the past identified the need for 4 houses but this had not been followed up in detail and there were no concrete plans.

Date of Next Meeting: 8 July 2010, 14 October. APM 13 May.

The meeting closed at 8.50.

[ BoilerPlate plate = “PC_Disclaimer” ]